
Rebuilt curb under a rooftop unit
Curbs, Decks And A Building That Stays Open
The commercial roofs in Berkeley are small ones: compact business buildings and the village’s institutional roofs, mostly flat, most of them carrying a rooftop unit or two. Trouble on those roofs tends to start under the equipment, where a curb sits on decking that has been wet for years. We rebuild what is underneath before new membrane goes down, and we plan the job so the doors stay open while we work.
Rooftop Units Sit On The Weakest Ground
A rooftop heating and cooling unit lives on a curb, a raised frame that lifts it above the roof and carries the flashing around its base. Over the years that curb takes condensate, drips from loose panels and the knees of every service technician who has worked on the unit. The wood softens, the decking under it follows, and the membrane around the base starts to wrinkle and split. The photo at the top of this page is our crew at exactly that kind of curb: rebuilt in new wood, with the rotted deck in front of it already cut open.
Why New Membrane Over A Soft Curb Fails
Wrapping fresh membrane around a curb that is already rotting looks finished on the day the crew leaves, and it fails early, because flashing is only as solid as whatever it is fastened to. We cut out the soft decking, rebuild the curb framing, re-deck the area and then flash the new curb into the new roof. The unit’s weight sits on sound structure again, and the flashing has something real to hold.
Pipes, Vents And Everything Else Up There
A small commercial roof collects penetrations over the decades: exhaust fans, plumbing vents, gas lines on blocks, abandoned curbs from equipment that left years ago. Each one is a place where water can get under the membrane. During a new roof we remove what no longer serves anything, deck over the holes, and flash what stays with new boots and metal, so the finished roof carries fewer openings than the old one did.
Opening The Deck Without Surprises
Some roofs need more than a curb repair. Where decking has rotted or rusted across a wider area, we open that section of the roof down to the structure. On many small commercial buildings that means steel bar joists, and once the bad decking is out, new decking goes in across them before anything else happens.
Over the patched area we lay a cover board, a gypsum panel such as DensDeck, so the new membrane gets a flat, firm surface across old and new decking instead of telegraphing every edge and fastener below. The photo in the side column shows a roofer cleaning out one of those openings with a cover board already set over part of it. We plan each opening so the building is dried in before the crew leaves for the day.
Drains, Edges And Where The Water Goes
A new membrane does little good if the water has nowhere to leave. On a small flat building that usually means one or two interior drains or a run of scuppers through the parapet, and both fill up with leaves, grit and whatever the wind carries onto the roof. Each drain gets its basket lifted and its bowl cleaned out, a rusted clamping ring is replaced rather than reused, and the new roof is built to fall toward those openings. At the perimeter, new edge metal holds the membrane down where wind gets under it first.
The Cheapest Day To Fix A Curb
The best moment to rebuild the deck under a rooftop unit is the week that unit is coming off anyway. When your heating and cooling contractor is already swapping equipment, the curb is empty, the rot is exposed, and the opening costs a fraction of what it does once a new unit is bolted on top. Tell us when the swap is booked and we will line the roofing up with it, so the new equipment lands on solid wood and fresh flashing.
Institutional Roofs Keep Their Own Calendars
The village’s institutional buildings bring different constraints than a shop does. Work may have to fit around the hours when the building is full, around events booked months ahead, or around a board that approves spending at its own meetings. We can walk the roof early, deliver the written scope in time for whoever signs off on it, and set the work dates to the calendar the building already keeps.
A Scope You Can Check Line By Line
Nothing on a commercial roof should be priced as one lump. The written scope names each curb, opening and flashing we plan to rebuild, puts a straight price beside each line, and comes back with photographs of every stage, so you can match what you paid for against what is on the roof.
Angelo On The Roof
Angelo Ristich learned roofing from his father Frank and runs Guardian now, and he is on site while commercial work happens, so the person who wrote the scope is the person checking it. We install TPO, EPDM, coatings and metal flashings, and the system is chosen for the building in front of us. Guardian is BBB A+ rated, holds a HomeAdvisor Elite Service award, and is licensed and insured in Illinois. The main commercial roofing page covers our wider service area, finished roofs are in the gallery, and the contact form takes the building address and roof history.

Cover board over an opened deck
In The Written Scope
Each curb, deck opening and flashing listed with its own price and photos.
Work hours, staging and access agreed with you before the first day.
(312) 590-4853Drains Before Membrane
Every drain basket lifted and its bowl cleaned out before new membrane goes down.
Abandoned curbs come out and their holes get decked over.
More from our Berkeley work: owners who want a condition report before committing to anything can start with commercial roof inspections, and a leaking seam or flashing on a smaller roof often only needs flat roof repair. Wind and hail damage is handled under storm damage repair, and the houses on the surrounding blocks are covered under shingle roof replacement. The Berkeley page covers the village as a whole, and the industrial stretch in Broadview, south past Roosevelt, gets the same crews.
From First Call To Final Photos
Measure It
Satellite measurements on the first call give you a number to plan a budget around.
Walk It
Curbs, seams, drains and soft decking checked across the whole field.
Write It
A scope priced line by line, readable by an owner who is never on site.
Build And Record
Sections opened, rebuilt and closed in order, each one photographed.
What Owners And Managers Ask Us
Should the roof work wait for the rooftop unit replacement?
If a unit swap is coming within the year, yes, line them up. With the old unit off, the curb and the deck under it can be repaired without disconnecting the unit a second time, and the new equipment goes onto sound wood. We coordinate dates with your heating and cooling contractor.
Why does the curb under our rooftop unit need replacing?
Because new membrane is only as good as what it is fastened to. Curbs take years of condensate and foot traffic, and the wood and decking under them rot. We rebuild the curb and the deck around it, then flash the new curb into the new roof.
What is a cover board, and why use one?
It is a rigid panel, often a gypsum board such as DensDeck, laid under the membrane over insulation or repaired decking. It gives the membrane a firm, even surface, so the edges of patched deck below do not show through or wear the new roof from underneath.
Who disconnects the rooftop unit during the work?
Your heating and cooling contractor handles the unit itself. We schedule around their visit so the unit is down only for as long as the curb work takes, and it goes back on solid structure once the new curb is flashed into the roof.
I own the building but live out of town. How do I follow the job?
Through photographs and a written scope. You get pictures of each stage, from the rotted deck we remove to the finished flashings, and the scope is written plainly enough to read without us on the phone. Angelo is your contact from start to finish.
Do you install TPO, EPDM or something else?
We work with TPO, EPDM, roof coatings and metal flashings. Which one goes on a building depends on its deck, its equipment, how much foot traffic the roof sees and whether the existing roof can be kept, and the written scope explains the choice.
Put The Building On Our Calendar
Send the building address, what it is used for, and what you know about the roof: when it was last redone, where the leaks show inside, how many rooftop units sit on it and whether anyone has coated it. If you manage the building for an owner who lives elsewhere, tell us who should receive the photos.
We will walk it with you or your manager, put the scope and a straight price in writing, and set work hours that suit the business below. If the field turns out to be sound and only the curbs and flashings need rebuilding, the scope says exactly that, because we would rather price the smaller job honestly than talk a building into a tear-off it does not need yet. Guardian works Monday to Saturday, 9 to 5, with emergency patch response when storms hit.