Tuckpointing For Buildings With Tenants, Boards And Deadlines
A commercial wall is a brick wall with a lot of people in the way. The storefront stays open, tenants still want light through their windows, the church has a Sunday schedule and the warehouse has trucks backing into the dock at six in the morning. Guardian runs tuckpointing on mixed-use, apartment, courtyard, church and warehouse buildings across Chicago and the suburbs, and we plan the job around the people who use the building before we plan the mortar.
Masonry Work On A Building That Stays Open
The brick on a three-story mixed-use building fails the same way the brick on a bungalow does. Freeze-thaw opens the joints, water finds its way in, and the mortar turns to sand. What changes on a commercial job is everything around the trowel: how the crew gets up the wall, who has to be told before the cutting starts, which entrance has to stay open, and who signs off at the end. Get those wrong and a good repointing job still turns into complaints from tenants and a hard conversation with the owner.
Lifts, Scaffold And The Sidewalk Below
Access sets the schedule more than the brick does. A two-story storefront with a short alley wall can often be worked from a boom lift in a day or two per elevation. A long courtyard building or a church gable usually wants frame scaffold, because the crew will be on that face for days and a lift would spend half its time repositioning. Taller walls need a different setup again, and we talk through the options before we put a number on anything.
The ground matters as much as the wall. Scaffold over a public sidewalk needs a covered walkway so people can pass under it safely, and in many towns setting equipment on a sidewalk, an alley or a parking lane takes a permit of its own. A warehouse lot needs the lift parked where it will not block a dock door. We sort that out on the walk-through, well before any equipment shows up.
Phasing Around Tenants And Customers
Nobody wants a building wrapped in plastic for a month. We break the work into phases, usually one elevation at a time, and give the manager a schedule that says which windows are covered on which days. Cutting days are loud and dusty. Packing and tooling days are quiet, so we try to put the cutting on mornings when the fewest people are home or the store is closed.
Storefront entrances stay open. Restaurant exhaust, patio seating and laundromat dryer vents get worked around. Courtyard buildings are a special case: the courtyard is often the only way into half the units, so we keep a clear path through it and work its three walls in sections rather than closing it off.
On a building full of tenants, the schedule is part of the repair.
Churches, Warehouses And Six-Flats Each Change The Plan
A church brings height, limestone trim and a calendar full of services, weddings and funerals that the crew has to work around. Older church brick and its soft mortar also call for the gentler approach covered on our restoration page. A warehouse is the opposite: long, plain walls of common brick or concrete block, often with a failing parapet up top and a loading schedule that decides when we can set up. Apartment buildings sit in the middle, with back porches, gangways and tenants who all need a heads-up.
Parapets, Where The Roof Meets The Brick
Most commercial buildings around Chicago have flat roofs behind a parapet wall, and the parapet is where we see the worst brick on the building. It takes rain from the street side, the roof side and the top. When the coping joints open up, water runs straight down into the wall and shows up as a stain or a leak in the top-floor units. The roof membrane runs up the inside of that parapet, and its counter-flashing is set into cut mortar joints.
This is where being a roofing company pays off for an owner. One crew can repoint the parapet, reset the coping and redo the flashing at the same time, instead of a mason and a roofer each blaming the other for the leak.
The Paperwork A Board Will Ask For
Where the city or village requires a permit for the masonry work or for equipment in the public way, we handle it. If an engineer or architect has already surveyed the facade, we work from their report and their marked-up elevations. Certificates of insurance go to the manager before we set up.
Photos are the part owners and boards care about most, because they are paying for work most of them will never see up close. Each elevation gets photographed before we start, with the cut joints showing their depth before any mortar goes in, and again when it is finished. The manager gets a set organized by wall, ready to forward to a condo board or an owner who has never been on the roof.
Scoping A Commercial Wall So It Can Be Budgeted
Big buildings rarely need everything at once, and most owners cannot fund it all in one year anyway. We walk every elevation and sort the brick into what needs work now, what can wait a season or two, and what is a structural question for an engineer first, such as a bulging wall or step cracks with bricks pushed out of line. To set up that walk, it helps to have:
- The address, plus which walls you already know are bad and where the leaks show up inside.
- How we get in: alley access, the roof hatch, keys for the boiler room or the courtyard gate.
- A tenant or store contact for each wall we will be working on.
- Any engineer’s report, past masonry invoices or old photos of earlier repairs.
- Board meeting dates, if the scope has to be approved before the season fills up.
Send what you have through the contact page.
Buildings We Work On
Storefronts and mixed-use, three-flats up to courtyard buildings, churches, warehouses and block-walled shops.
Work phased by elevation, permits pulled where the town requires them, and a photo set for the owner or board. Commercial and multi-family roofs we have done are in the gallery.
(312) 590-4853How A Commercial Job Gets Scheduled
Walk Every Elevation
With the manager, from the ground and the roof. Each wall gets sorted into now, later or engineer first.
Phase The Building
A written order of walls and dates, cutting days kept off the busiest hours, entrances left open throughout.
Set Up Access
Lift or scaffold chosen for the wall, sidewalk protection where people walk under it, permits filed before setup.
Photograph And Hand Over
Before, cut-depth and finished photos by elevation, with notes on what still needs attention next year.
Related work: when a whole face of a building has gone sandy, full mortar joint replacement explains how a full-wall job runs. Concrete block warehouse walls and limestone lintels fall under masonry tuckpointing for block and stone, and older church brick usually needs restoration tuckpointing with lime mortar. For the whole building envelope, see exterior tuckpointing, and a leaking parapet often goes together with flat roof repair behind it. We work commercial walls in Chicago, Cicero and Elk Grove Village.
Questions Owners And Managers Ask
Can our tenants stay in the building while you work?
Yes. We work one elevation at a time and only cover the windows on the wall being cut that day. Tenants get notice of which days are loud and dusty, and entrances stay usable the whole time.
Who takes care of the permits?
We do, where the city or village requires one for the masonry work or for scaffold and lifts on a sidewalk or alley. Requirements differ from town to town, so we confirm what applies to your address during the walk-through.
Can you work around our business hours or church services?
That is part of the plan from the start. Cutting is the noisy, dusty part, so we schedule it for the hours that bother the fewest people. Quiet work like packing and tooling can run while a store is open.
How will our board know the work was done right?
Every elevation is photographed before we start, with the joints cut out to depth, and again when it is finished. The set comes to you organized by wall, so a board member who never climbs the scaffold can see what they paid for.
Can we split the job across two seasons?
Often, yes. We rank the walls by how bad they are and how much water they take, so the worst ones get done first. The rest can be scheduled for the following year without leaving open joints over a winter.
Our top-floor units leak near the parapet. Is that a masonry or a roofing problem?
Frequently it is both. Open coping joints and failed parapet mortar let water into the wall, and the roof flashing tucked into those joints fails with them. We are a roofing company, so we can repair the brick and the flashing in the same visit.
Send Us The Building Address
Tell us what kind of building it is, which walls worry you and when your board meets. We will walk it with you, sort the brick by priority and give you a straight answer on scope and phasing before anything goes up the wall.